16 December 2020
The characteristics of the works are as follows: two independent separate carriageways, two lanes in each direction, no crossroads, tunnel about 1.600m long fitted with a vehicle exhaust fume treatment system, natural and artificial noise-proofing barriers, sliproads at intersections with urban road networks.